List of Representative Projects

  •          Toronto Transit Commission, Toronto York Spadina Subway Extension (TYSSE) Project
  •          City of Mississauga, Soil Sampling and Testing at a Site on Shawson Drive, Mississauga
  •          Town of Oakville, Oversight of Remedial Activity at An Industrial Site on Wyecroft Road, Oakville
  •          Loblaws, Phase I/II ESAs at A Commercial Site on Redway Road, Toronto
  •          Town of Oakville, Soil Vapour Investigation at A Residential Area on Inglehart Street North, Oakville
  •          Soil and Groundwater Quality Assessment Near a Transformer at Saputo Site, Guelph Street, Georgetown
  •          Infrastructure Ontario, Phase I/II ESAs at A Hospital on Fennell Avenue West in Hamilton
  •          City of Mississauga, Phase I/II ESAs at a Site on Loreland Avenue in Mississauga
  •          City of Mississauga, Environmental Assessment Summary for Former OPG Land on Hydro Road in  Mississauga
  •          Construction of Permissible Reactive Barriers and Impermeable Barrier for Nortel Site in Woodbridge
  •          Waterfront Toronto, Geotechnical and Hydrogeological investigation and Risk Assessment (Canada Square Project) on Queens Quay West in Toronto
  •          Canadian National Railway, Groundwater Monitoring and Sampling at a Site for CN in Richmond Hill
  •          Lafarge, Phase II ESAs in Thunder Bay for a former Esso distribution Facility (decommissioned) – Lafarge Site (2008), and Subsequent Groundwater Monitoring and Sampling
  •          Phase I/II ESAs, Commercial Site in Stoney Creek, Hamilton (including Two Stages of Phase II ESAs)
  •          Lafarge, Preparation of Site Assessment Report for a Lafarge Site of a Former Quarry near Niagara
  •          Phases One and Two Environmental Site Assessment, 30 Railside Road, Toronto, Ontario
  •          Updated Phase One Environmental Site Assessment, South Side of Doane Road, Holland Landing (Blocks 181, 182 and 183, Plan 65M- , Part of Lots 109 and 110, Concession 1), Town of East Gwillimbury, Ontario
  •          Phase Two Environmental Site Assessment, Eglinton GO Station, Eglinton Avenue East, Toronto, Ontario
  •          Updated Phases One and Two Environmental Site Assessment,7997 Kennedy Road and 31 Helen Avenue, Markham, Ontario
  •          Phase One Environmental Site Assessment, 900 Brock Road, Pickering, Ontario
  •          Phase Two Environmental Site Assessment,900 Brock Road ,Pickering, Ontario
  •          Updated Phases One and Two Environmental Site Assessment, 155 Snively Street,Richmond Hill, Ontario
  •          Supplemental Geoenvironmental Investigation, Port Credit Go Station Lot B East Parking Lot, Mississauga, Ontario
  •          Updated Phases One Environmental Site Assessment, Part Lot 98 and 99, Concession 1, Newmarket, Ontario
  •          Hydrogeological Site Assessment for Proposed Additions to Senior’s Residence, 33 Brooks Street, Barrie, Ontario (and PTTW application)
  •          Hydrogeological Site Assessment, Southwood 3 and Southwood 4 Residential Subdivision, 1143 Listowel Road, Elmira, Ontario
  •          Hydrogeological Site Investigation and Assessment for 155 Snively Street Proposed Residential Development, Town of Richmond Hill, Ontario (co-author)
  •          Geotechnical Investigation and Design for MTO Horizontal Directional Drilling (tunnelling, MTO RAQS High Complexity) crossing MTO Highway 401 and 400 at Trenton, Woodstock, Dutton, Mallorytown, Cambridge, Bowmanville, Newcastle and Kirby Road in Maple;
  •          High Mast Light (HML) Pole Design as per MTO Standard for the King City service centre; Noise Barrier Wall replacement Highway 401 Oshawa (RAQS Low Complexity); 
  •          Geotechnical Investigation and Design for the proposed 2.5 m diameter tunnel along Highway 50 in York Region; Construction Inspection and Reporting for 3.0 m diameter Trunk sewer tunnel along 16th Ave. in Markham
  •          Foundation Investigation and Design for Buildings, Gas Bar Canopy, Underground Fuel Tanks, Water and Wastewater Facilities on 22 Service Centres along the Highway 401 and 400; the founding soils conditions vary from bedrock to very soft Lead Clay
  •          Foundation Investigation and Design Reports for new Bridges: Don River tributary one span new bridge, Rosedale; Kerrison Drive new bridge over Carruthers Creek, Ajax; Birchmount Road new bridge over Rouge River, two span 80 m bridge, Markham
  •          Foundation Investigation and Design Reports for Bridge Replacement: Whitevale Bridge over Duffin Creek, two span 40 m, Pickering; Beaverdams Bridge, Thorold; Power Canal Bridge, Niagara Region
  •          Foundation Investigation and Design Reports for Pedestrian/Foot/Vehicular Bridges:  Mt. Pleasant subdivision Crossing C pedestrian bridge, Crossing D pedestrian bridge in Brampton; Rosedale Golf Course vehicular bridge, vehicular bridge over Emery Creek, foot bridge relocation over Emery Creek in Toronto, Bob Hunter Memorial Park 40 m span pedestrian/vehicular bridge, Sandwood Foot Bridge, Brampton; Vehicular bridge replacement in Knob Hill Park, Toronto; New pedestrian bridge in Downsview Dells Park, Toronto
  •          Numerous small bridges and culvert replacements: Four small bridges and culverts, Township of Brock; Small bridge on Old Scugog Road, Bowmanville; Culvert in Wbitby Marina, Whitby; Jane Street culvert over Black Creek, Toronto; Dufferin Street Culvert, Tronto; Small bridge on Walkers Line, Burlington
  •          Foundation Evaluation for Swing Bridge Dam over Channel, Sault Ste Marie, Public Works and Government Services Canada
  •          Geotechnical Foundation Evaluation and Stability Analysis for moveable (swing) bridge over Trent-Severn Canal at Port Severn and Hastings for Public Works and Government Services Canada
  •          Geotechnical Foundation Evaluation and Stability Analysis for fixed bridge abutment instability Trent-Severn Canal at Hamlet, Ontario for Public Works and Government Services Canada
  •          Hydro One Facility redevelopments: Hydro One Building Addition and Renovation for Belleville Site; Elevator Addition for Building for Hydro One Facility in Orangeville; Concrete Apron for Main Building for Hydro One Facility in Orangeville
  •          Foundation Design and Inspection for High Rise Condo or Commercial Building:  Yonge & Sheppard High Rise Condo; High Rise office building at 7980 Birchmount Road in Markham with a maximum column load of 12,000 kN; Four Season Hotel, Richmond Hill; X Hotel Downtown Toronto; High rise Condo at Birchmount Road and HWY 7 in Markham; High Rise multi-use building for Ryerson University; etc.
  •          Industrial Northland Power Plant Foundation Reports, York Region
  •          Plate Load Testing Analysis and Subgrade Reaction Modulus for Various Sites
  •          Investigation and report for floor slab settlement
  •          Underground Service Installations for various locations across Ontario under various soil and groundwater conditions
  •          Recommendation on Micropiles for Seismic Retrofit for Existing Building
  •          Numerous Reports on Building Foundation and Land Development Sites
  •          Changeable Message Sign (CMS) for MTO Highway 401 Allen Road Ramp
  •          Bridge Condition Survey (geotechnical perspective) for MTO Highway 401 southwest Region
  •          Kennedy Road Widening Pavement Investigation and Report
  •          Various Road Condition Survey, Pavement investigation, Evaluation and Rehabilitation
  •          Pavement Investigation and Report for York Busway Route for TTC
  •          Settlement Analysis for Rogers Campus Tower in Downtown Toronto
  •          Investigation and Report for Oshawa Water Plant Expansion under Artesian Condition of 4.2 m High
  •          Report on Floor Slab over Compressible Organic Silt for Toronto Treatment Plant
  •          Slope Stability Analysis and Geotechnical Setback Study: Eagle Point Slope on DVP, Toronto; Rouge River Slope in Markham; Slope for CN Rail Embankment; Deep Seated Stability for Retaining Wall on Soft Soils for Victoria Park Ave Toyota Dealership; Slopes at Greensborough subdivision; slope failure and retaining wall failure for Ritson Road embankment, Oshawa; Slope failure for a house in Whitby; Slope failure investigation for a house in King City; 25 slopes for Seaton Lands subdivision. Pickering; slope for Parkview Golf course, Markham; numerous slope stability analysis and setback study for residential houses dealing with TRCA
  •          Investigation and Report on HDD for Gas Pipelines for Enbridge Gas
  •          Investigation and Report on Piling or Caisson Foundation:  North York General Hospital, Powerstream Hydro Tower, St. Michael Hospital, CTC Land Development, Don Valley North Toyota Development, Upper Canada Mall Expansion, etc.
  •          Arrange Slake and Packer Testing on Shale bedrock for TTC on Union Station
  •          Pavement Investigation and Report:  Trillium Health Centre- Upgrade, U of T Mississauga Campus Pavement Design
  •          Caisson Inspection for CN Rail Bridges
  •          Pavement Investigation:  MTO QEW Detour Mississauga, MTO HWY 7 Peterborough, Various Roads in Toronto, York and Peel Region, etc.
  •         FWD & HWD Testing on Various Roads
  •          Geotechnical Investigation for various works like watermain, sewer, building, tunnel, etc.
  •          Pavement Investigation and Design:  National Freeway 101, 309, Pingzhu Road, Rongtai Road, etc.
  •          Geotechnical/Structural and Design of Bridge Structures:  12 Bridges on Weilai Freeway; Numerous culvert and small bridges on Weilai Freeway
  •          Geotechnical/Structural and Design of Bridge Structures:  6 Bridges on Rizhu Road, Bridge Widening of 4 Bridges on national Highway 209, Various Bridges and Culverts Geotechnical/Structural Designs, etc.
  •          Pavement Condition Survey and Evaluation, Benkelman Beam Investigation, proofrolling, Engineered Fill
  •          2.3 km Viaduct Bridge in Yellow River Delta; 54 km Highway Construction and 12 Bridges numerous Culverts
Comments